2023-05-04
If the inverter is to be placed near the main switchboard, no special preparation is needed. If it’s to be placed elsewhere, for example, with the switchboard in the hallway/vestibule and the inverter in the garage/utility room, wiring can be installed between these locations during the house’s electrical installation phase. We suggest placing the inverter as close as possible to the main switchboard, for instance in a utility room or garage, which eliminates the need for additional wiring connecting the inverter to the main switchboard. The cable cross-section is crucial for system efficiency and safety. The installation of all components is always agreed upon with the investor.
After assembling the roof, we leave a cable running from the roof into the building. It can be built into the structure during interior work.