2023-05-04
The correctness of cable connections is controlled before the roofing is laid, and through a properly designed system of flashings, they are not exposed to the weather at a later time. In addition, immediately after installation BP2 representative checks the correctness of the electrical installation after the roofing work with a meter.
Share that article with friends
© Copyright 2024